Polariod Border
Polariod Border
ClimateX
University of Oxford Logo
Scrabook Top Border
Log In

Oxfordshire Climate-X-Change Gallery

Liam cutting hemp batts for underfloor insulation

Liam installing floor insulation
(uploaded by tina)

First underfloor insulation installed

Underfloor insulation
(uploaded by tina)

Dan and Liam installing dining room floor insulation

Floor insulation being installed
(uploaded by tina)

Front room with plaster and floorboards removed

Front room stripped bare
(uploaded by tina)

Day 4 of eco-renovation: external insulation all attached to outside wall.

External insulation completed
(uploaded by tina)

First coat of render complete on external insulation at the end of Day 5.

First coat of render complete
(uploaded by tina)

First, an aluminium base rail is fitted to the wall, then the Pavatex panels are attached in interlocking rows.

Base rail and initial panels installed
(uploaded by tina)

Here at last is a photograph of the finished house.

The finished house
(uploaded by catherined)

Not very exciting photo of our house, featuring side wall before insulation is added

House before external insulation
(uploaded by tina)

Pages: 1 2 3 4 5 6 7 8 9 10 11 Previous Next