Blog posts in July 2008 by catherinedThe house is starting to look quite cosy now as the insulation is being fixed on to the main walls of the house. A mesh is then fitted onto the outside of the insulation to provide a key for the render. One of the challenges is fitting the fairly solid and rigid insulation around all the things on the walls. The outside light needed to be removed and the insulation fitted around the cable. The gas meter is on an outside wall so will need to be insulated around. The flue for the gas boiler needs to be extended to accommodate the extra depth of the insulation and then have the insulation fitted around it. Blog post by catherined on July 09, 2008 at 2:23 p.m. Tags: flue, insulation, solid walls No comments have been posted yet. The brickwork below the damp-proof course has now been insulated with Foamglas and a membrane is being fitted on top to form a barrier between this and the rest of the insulation above. Repairs have been made to the brickwork, an extra wooden frame has been added around the window ready for the insulation and the large gaps between the windows and the wall, revealed when the render was removed, have been filled. I presume these gaps are from when the double glazing was fitted around 7 years ago,
Blog post by catherined on July 07, 2008 at 9:05 p.m. Tags: damp proofing, Ecohouse, insulation, solid walls No comments have been posted yet. While we wait for progress on the outside of our house here’s some info about our stove. Our wood-burning stove was installed earlier this year, in March (just before Easter). Blog post by catherined on July 07, 2008 at 2:24 p.m. Tags: Ecohouse, insulation, stove, sustainable energy, waste, wood fuel Posted by stevaxx 1 year, 7 months ago:
|